Sugözü Imported Coal-Fired Power Plant, İskenderun

Sugözü Imported Coal-Fired Power Plant, İskenderun



The design includes coastal structures of two main parts as the coal unloading jetty and the access bridge so that the plant uses imported coal.


Coastal structures are composed of a coal unloading jetty, an additional access bridge connecting the unloading jetty to shore with 600 m long in total, the bunker platform (22.20 m x 11.35 m), vehicle turning platform (19 m x 9 m), mooring and berthing dolphins and access bridges.

 

 



 