The project will enable export of various dry bulk materials such as; aggregate and sand to be used for Sochi 2014 Winter Olympic Games construction works. Preliminary design and technical consulting services were provided for two dry bulk quays of 140 m and 220 m lengths with a depth of -9.0 m and a 30 m wide Ro-Ro ramp.

 

 